62 Lagoon Refit Project
Maz Ocean was awarded the project management of an extensive refit on a beautiful Lagoon 620. Maz Ocean took on the extensive refit project with a tight deadline of just 6 weeks. The project involved a number of aspects with Maz Ocean handling all the electrical, part of the electronics, and many marine systems. Maz Ocean utilized its vast sub-contractor relationships to handle additional areas outside of its expertise and to ensure the deadline was met.
The project was a great challenge but came together perfectly in the end. Maz Ocean team experienced an odd hiccup or two, but that is always expected when taking on a project of this magnitude. The Lagoon 620 set sail on time to meet its charter obligations.
The project involved custom solutions and installation of the below as well as additional modifications not listed:
New Onan 13KW generator
New Maretron monitoring system
New Nobltec navigation software
Upgraded marine electronics
Upgraded and replaced marine electrical components:
New 110V system for US appliances and outlets while maintaining the European 220V system
20+ new 110V outlets and USB jacks
Shore power conversion
New fridge/freezer and ice maker
New distribution panel
New audio/visual system
Numerous carpentry modifications
New Bimini, sails, and matching canvas
New hatch screens/shades throughout
General ecology water filters for the galley
Tender overhaul including gel coat repairs, new seat cushions and covers, and all new electronics and stereo
New stainless steel hand holds and hand rails
Name change and installation of illuminating three dimensional lettering
Hull decals replaced with colored gel coat and new window decals.
Maz Ocean’s completion of this major refit was possible through the tireless dedication of our staff and the various sub-contractors involved. A big thank you to our team and sub-contractors.
Maz Ocean’s ability to meet tight and sometime impossible deadlines is key to our success and the continued relationships with many satisfied customers. We look forward to future projects on Lady Katlo and a long term relationship with the Captain and Owner.
Main Benefits
Refreshed appearance
Improved functionality and additional features for marine electrical, electronics, and other systems
On-time execution of a major refit project